Projects
Post-Construction
Final and rough cleans for general contractors. The clean before the walkthrough that decides whether you get signed off or sent back.
We schedule against your trades, not our week
Post-construction cleaning fails when it is scheduled optimistically. Trades run late, and a final clean performed before the last of the dust-generating work simply has to be done again.
We sequence around your actual trade schedule and we can mobilize at short notice when the date moves, because it will.
Rough, final, and the punch-list clean nobody budgets for
Rough clean to clear bulk debris and make the space workable. Final clean to inspection standard: glass, fixtures, frames, tracks, and every horizontal surface including the ones above eye level. Then the touch-up after punch-list work, which is the one most often left out of the bid and most often needed.
Insured for working on your site
Commercial general liability, workers' compensation, and additional-insured status for your project. Certificates issued to your requirements before we mobilize.
What a typical scope covers
- Rough clean and bulk debris removal
- Final clean to inspection standard
- Post-punch-list touch-up cleaning
- Interior and exterior window and glass cleaning
- Floor protection removal, strip, seal, and finish
- High dusting, fixtures, frames, and tracks
- Dumpster coordination and debris haul-away
Every scope is written to the building after a walkthrough. This is a starting point, not a package.
Want to see what we'd actually do in your building?
A walkthrough costs you an hour and commits you to nothing.